Aladağ, H and Işık, Z (2019) Design and construction risks in BOT type mega transportation projects. Engineering, Construction and Architectural Management, 26(10), 2223–42.

  • Type: Journal Article
  • Keywords: Design; Risk management; Project management; Construction;
  • ISBN/ISSN: 0969-9988
  • URL: https://doi.org/10.1108/ECAM-08-2018-0351
  • Abstract:
    In build-operate-transfer (BOT) transportation projects, design and construction phases are critical in terms of their effect on time and cost overruns. The purpose of this paper is to identify the role of risk factors affecting these phases and their significance level for BOT transportation projects. Design/methodology/approach Design and construction risks were determined and then validated by focus group discussions. Afterwards, an illustrated case study was presented to better understand the effects of determined risks in a BOT mega transportation project. As the last step of the study, the fuzzy analytical hierarchy process method was used to prioritize risk factors. Findings The prominent risk factors were found out as occupational accidents, integration between design and construction phases and excessive design variations. Research limitations/implications Different kinds of BOT transportation projects in different countries might be executed very differently considering specific social, political, economic and other factors. However, the results of the study are important in terms of the specific lessons learned from the case study that can be used as a foundation for developing possible risk mitigation measures. Originality/value Though the risk management of BOT projects has been investigated frequently in the literature, there is a knowledge gap in the quantitative evaluation of risk significance specific to design and construction risks. The prioritization of determined risks with an associated case from a mega transportation project will contribute to the BOT project practitioners about possible challenges in design and construction phases in BOT mega transportation projects.

Almarri, K, Aljarman, M and Boussabaine, H (2019) Emerging contractual and legal risks from the application of building information modelling. Engineering, Construction and Architectural Management, 26(10), 2307–25.

Cajzek, R and KlanÅ¡ek, U (2019) Cost optimization of project schedules under constrained resources and alternative production processes by mixed-integer nonlinear programming. Engineering, Construction and Architectural Management, 26(10), 2474–508.

Derakhshanfar, H, Ochoa, J J, Kirytopoulos, K, Mayer, W and Tam, V W (2019) Construction delay risk taxonomy, associations and regional contexts. Engineering, Construction and Architectural Management, 26(10), 2364–88.

Fang, Y and Ng, S T (2019) Genetic algorithm for determining the construction logistics of precast components. Engineering, Construction and Architectural Management, 26(10), 2289–306.

Jin, H, Liu, S, Liu, C and Udawatta, N (2019) Optimizing the concession period of PPP projects for fair allocation of financial risk. Engineering, Construction and Architectural Management, 26(10), 2347–63.

Kumar Singla, H (2019) A comparative analysis of long-term performance of construction and non-construction IPOs in India. Engineering, Construction and Architectural Management, 26(10), 2447–73.

Kunieda, Y, Codinhoto, R and Emmitt, S (2019) Increasing the efficiency and efficacy of demolition through computerised 4D simulation. Engineering, Construction and Architectural Management, 26(10), 2186–205.

Kwofie, T E, Aigbavboa, C O and Machethe, S O (2019) Nature of communication performance in non-traditional procurements in South Africa. Engineering, Construction and Architectural Management, 26(10), 2264–88.

Lau, C H, Mesthrige, J W, Lam, P T and Javed, A A (2019) The challenges of adopting new engineering contract: a Hong Kong study. Engineering, Construction and Architectural Management, 26(10), 2389–409.

Loosemore, M, Sunindijo, R Y, Lestari, F, Kusminanti, Y and Widanarko, B (2019) Comparing the safety climate of the Indonesian and Australian construction industries. Engineering, Construction and Architectural Management, 26(10), 2206–22.

Oyewobi, L O, Oke, A E, Adeneye, T D and Jimoh, R A (2019) Influence of organizational commitment on work–life balance and organizational performance of female construction professionals. Engineering, Construction and Architectural Management, 26(10), 2243–63.

Qayoom, A and H.W. Hadikusumo, B (2019) Multilevel safety culture affecting organization safety performance: a system dynamic approach. Engineering, Construction and Architectural Management, 26(10), 2326–46.

Sinesilassie, E G, Tripathi, K K, Tabish, S Z S and Jha, K N (2019) Modeling success factors for public construction projects with the SEM approach: engineer’s perspective. Engineering, Construction and Architectural Management, 26(10), 2410–31.

Whang, S, Park, K S and Kim, S (2019) Critical success factors for implementing integrated construction project delivery. Engineering, Construction and Architectural Management, 26(10), 2432–46.

Xiong, B, Newton, S, Li, V, Skitmore, M and Xia, B (2019) Hybrid approach to reducing estimating overfitting and collinearity. Engineering, Construction and Architectural Management, 26(10), 2170–85.